Ever increasing volumes and similarly ever increasing and consequential increment in risk to people passing through high volume pedestrian areas necessitates the most stringent evaluation of products used to control, direct and ensure the free flowing passage of users. Perhaps with our operation and installation of applications within the London Underground station environment we are able to provide equipment and products which meet those very exacting requirements.
Hand Rails
Designed and constructed with their application in mind and to aid pedestrians through stairs, ramps, corners or other "hazards". Constructed from brass, stainless steel or graded steel (galvanised or painted), supported with structural calculation to verify their manufacture and integrity, and design configured to meet on site requirements. Some recent exapmles of their use are shown below.
| Allington Towers Handrails |
| Start Date |
23/05/2005 |
|
| Completion |
09/09/2005 |
| Status |
Completed
|
| Location |
Allington Towers
|
| Description |
Replace existing hand rails with new pollished hand rails
|
| Newbury Park Hand Rail |
| Start Date |
11/03/2005 |
|
| Completion |
28/06/2005 |
| Status |
Completed
|
| Location |
Newbury Park
|
| Description |
Survay and install client specified hand rail, to preimiter of flat station roof.
|
more hand rail projects
Barriers
Designed and constructed in fully traceable stainless steel, grade steel, galvanised or painted, wall, post or floor fixed, inclusive of exits, gates or emergency escape features and supported and complying with structural calculations to ensure integrity, and in styles, of heights and in configurations to meet the demands of their application. Some recent exapmles of their use are shown below.
| Blackhorse Road Barrier Replacement |
| Start Date |
09/02/2005 |
|
| Completion |
01/11/2005 |
| Status |
In progress
|
| Location |
Blackhorse Road
|
| Description |
Replace existing barrier at Blackhorse rd station.
|
| Northfields Depot Wheel Lathe Building |
| Start Date |
27/05/2004 |
|
| Completion |
26/09/2005 |
| Status |
In progress
|
| Location |
Northfields Depot
|
| Description |
Fabricate and install a steel framed building, and fully fire stop it.
|
more barrier projects
Tensile Barriers
Used where temporary restriction or redirection of pedestrian flow is desired, the barrier consists of alternate black and yellow, diagonally striped safety treated, retractable webbing housed in a stainless steel tamper proof canister which may be mounted on self supporting stand alone posts and/or wall mounted stainless steel plates. Features may include emergency pressure break. The barrier is approved and compliant with stringent Underground regulations. Some recent exapmles of their use are shown below.
| Marylebone Tensile Barriers |
| Start Date |
20/05/2004 |
|
| Completion |
27/05/2004 |
| Status |
Completed
|
| Location |
Marylebone
|
| Description |
Supply tensile barriers for Marylebone Station.
|
more tensile barrier projects
Queue Systems
Typically for orderly crowd control in relation to customer queues at information and ticket windows in station ticket and entrance halls or other specified application. Generally constructed from stainless steel with directional flow and emergency exit gates and supported with full structural calculations. Some recent exapmles of their use are shown below.
| Vitoria Move Queueing system |
| Start Date |
16/08/2005 |
|
| Completion |
01/11/2005 |
| Status |
In progress
|
| Location |
Victoria
|
| Description |
Remove existing queueing system and reinstall in a different location.
|
| Highbury & Islington Queue System |
| Start Date |
11/08/2004 |
|
| Completion |
10/10/2004 |
| Status |
Completed
|
| Location |
Highbury & Islington
|
| Description |
Queue system in front of ticket office.
|
more queue systems projects
Fencing
Generally adopted in above ground environment where passengers are to be protected from inadvertent access to adjoining private property or secured from local "hazards". Specifically designed for on site application with appropriate fixing and inclusive of authorised personal gates and doors as necessary. Some recent exapmles of their use are shown below.
| Hammersmith Window Panels And Fencing |
| Start Date |
15/08/2005 |
|
| Completion |
15/10/2005 |
| Status |
Completed
|
| Location |
Hammersmith
|
| Description |
Supply and fit polyester powder coated panels to the entrance door and windows. The project also requires the moving of track side fencing to a new position on the same site.
|
| West Harrow Fencing |
| Start Date |
15/08/2003 |
|
| Completion |
10/09/2003 |
| Status |
Completed
|
| Location |
West Harrow
|
| Description |
Supply and install galvanised steel fencing.
|
more fencing projects